Every project requires an East End Slabs supervisor to complete
a checklist and sign their approval of the quality and workmanship.
This occurs at 3 separate stages:
- Pre Plan: Prior to starting work all boundary fences and
excavations are checked. Survey peg locations are confirmed
so work can begin without delay
- Steel and Pour Stage: We ensure our product meets strict quality standards
- Frame Stage: The project is inspected two days after we pour to make
certain the frame is properly supported by the slab
|